Statistics:
- Length:
- 46 km
- Termini:
- Eastern: Pacific Highway (A1), Gore Hill Freeway (M1) and Longueville Road, Lane Cove North.
- Western: Bridge Street and Macquarie Street (A9), Windsor.
- Suburbs, Towns & Localities Along Route:
- Lane Cove North, North Ryde, Macquarie Park, Marsfield, Epping, Cheltenham, Beecroft, Carlingford, North Rocks, Baulkham Hills, Bella Vista, Kellyville, Beaumont Hills, Rouse Hills, Riverstone, Vineyard, McGraths Hill and Windsor.
Route Numbering:
- Current: M2 A2
- Former: 2 28 40
- Road Authority Internal Classification: 1
- 6002 (Baulkham Hills to Lane Cove North)
- MR184 (Windsor to Beaumont Hills)
- MR635 (Beaumont Hills to Baulkham Hills)
General Information:
M2 / A2 is a major route located in the Sydney area, linking the northwestern suburbs with Sydney's inner suburbs, and eventually via, several other routes to the central business district.
The standard of the route varies from multi-laned arterial road through to freeway standard (covered by the 21 km long Hills Mwy) 2. It passes through inner city suburbs, residential areas, light industrial areas and semi-rural areas.
The Hills Motorway segment of M2 was funded and built by the private sector which will operate, maintain and repair the motorway until 2042, when it will revert to the ownership of the NSW government. The Hills Motorway consists of a four-lane motorway plus a two-lane busway (between the east-bound and west-bound carriageways) from Beecroft Road to Old Windsor Road, breakdown lanes and cyclist lanes. 2
History:
- Lane Cove Tunnel:
- 24 June 2004: Tunnelling began on the Lane Cove Tunnel. 3
- 25 March 2007: The 3.6 km length tunnel opened to traffic, with two-lane tunnels, with three lanes provided in long sections. 3
- March 2007: Metroad 2 rerouted from Epping and Longueville Roads to the then newly opened Lane Cove Tunnel. 2
- Hills Motorway:
- 26 May 1997: Hills Motorway opened to traffic, given Metroad 2 designation. 2
- August 2013: Widening of Hills Motorway completed. 4
- Old Windsor Road and Windsor Road:
- 1792 onwards: Construction of what is now named Windsor Road and Old Windsor Road. 2
- 1794: A road was established between the Green Hills / Hawkesbury area and the older settlement at Parramatta. 2
- 1797: Governor Hunter ordered landholders to undertake road improvements along the Hawkesbury Road, including widening the road to 20 feet. (This is the date for the creation of the Windsor Road as a carriageway). 2
- 1802: A bridge was constructed at a new South Creek crossing of the Windsor Road, financed by tolls, and replacing the previous punt crossing further east. The current road alignment at South Creek dates from this time. The earlier road alignment, leading to the punt crossing, is reflected in the alignment of the present day Hawkesbury Road. 2
- 1805: Surveyor James Meehan surveyed an alignment between Parramatta and Kellyville which became the basis for the (New) Windsor Road in 1813. 2
- 1810: Governor Macquarie established five towns along the Hawkesbury River: Windsor, Richmond, Pitt Town, Wilberforce, and Castlereagh. A contractor, James Harrex, was engaged to build a new turnpike road between Parramatta and Kellyville, following Meehan's 1805 alignment via Castle Hill. This new alignment would avoid the hilly section (referred to by Governor King in 1803 as "the Seven Hills") of the original (Old) Windsor Road. The new alignment also enabled a more direct route to the Hawkesbury from Sydney. 2
- 1812: Upon the failure of James Harrex to complete the new road works, John Howe took over and completed the contract, which included the construction of 70 bridges. The new road was 32 feet wide and alignment stones marked the carriageway. 2
- 1810s: Governor Macquarie introduced a toll system on the Windsor Road with toll gates north of Parramatta and south of Rouse Hill. 2
- 1816: Construction of a toll house at Rouse Hill. 2
- 11 September 1833: Windsor Road was proclaimed as a Main Road and gazetted, with Old Windsor Road being declared a Parish Road. 2
- 1835: A toll house, the second on the site, was constructed at the South Creek crossing near Windsor. 2
- 1849: The Windsor Road Trust was formed to oversee maintenance of the Windsor Road. 2
- 1853: Fitzroy Bridge constructed across South Creek at Windsor, replacing the earlier Howe's Bridge. 2
- 1924: The Department of Public Works used water-based macadam in reconstructing the Windsor Road near Rouse Hill. Water-based macadam was an improved road surface treatment necessitated by the rapid rise of the motor vehicle. 2
- 1926: A bitumen coating was laid completed on Windsor Road near Rouse Hill, and renewed in 1928-9. 2
- 22 May 1928: Windsor Road, together with Bells Line of Road and the Darling Causeway was announced as Main Road 184. 2
- 1940s: Cutting and filling of the Old Windsor and Windsor Roads was reportedly undertaken by the United States military to prepare evacuation routes should a Japanese invasion take place in Sydney. 2
- 1948: Shoulders of the Windsor Road were widened to 22 feet to provide for anticipated traffic. 2
- March 2002: Upgrade to four lanes from Sunnyholt Road to Merriville Road, Kellyville completed. 2
- June 2002: Upgrade to four lanes from Henry Road to Curtis Road, Vineyard completed. 2
- October 2002: Upgrade to four lanes from Norbrik to Celebration Drive, Bella Vista completed. 2
- February 2003: Intersection improvements at Old Windsor Road and Seven Hills Road, and Seven Hills Road to Abbott Road, Seven Hills completed. 2
- August 2003: Upgrade to four lanes from Merriville Road to Schofields Road, Rouse Hill completed. 2
- April 2004: Upgrade to four lanes from Schofields Road to Mile End Road, Rouse Hill completed, and also the upgrade to four lanes from Level Crossing Road to Henry Road, Vineyard completed, plus the upgrade to four lanes from Curtis Road, Vineyard to Pitt Town Road, McGraths Hill completed. 2
- July 2006: Upgrade to four lanes from Roxborough Park Road to Norwest Boulevard, Baulkham Hills completed, also the upgrade to four lanes from Acres Road to Old Windsor Road, Kellyville completed. 2
- September 2006: Upgrade to four lanes from Boundary Road to Level Crossing Road, Vineyard completed. 2
- December 2006: Upgrade to four lanes opened to traffic from Mile End Road, Rouse Hill to Boundary Road, Box Hill. 2
1 NSW Government, Transport for NSW, Schedule of Classified Roads And State and Regional Roads, July 2022.
2 Roads and Maritime Services.
3 Australian Tunnelling Society, Lane Cove Tunnel.
4 Transurban, Roads and Projects.